Hubei Henglong Automotive Systems Group Co., Ltd. – Cleanliness Testing and Analysis Equipment Delivered
Hubei Henglong Automotive Systems Group Co., Ltd. was established on March 7, 2007, with Chen Hanlin as its legal representative. The company’s registered capital is USD 39 million, and its unified social credit code is 91421000798750002M. The company is located at Oriental Avenue in the Jingzhou Economic Development Zone, at the intersection with Shacen Road. It operates in the automotive manufacturing industry and its business scope includes the design, production, and sale of energy-absorbing steering systems of various specifications and models, automotive drive shafts, transmissions, and other automotive components, as well as after-sales maintenance services for these products. (For activities subject to licensing requirements, the company may only engage in such activities upon obtaining the requisite permits from the relevant authorities.) Currently, Hubei Henglong Automotive Systems Group Co., Ltd. is in good standing and remains in operation.
Our company offers the following extraction equipment model: HACCO-767C.
Our company’s automated cleanliness extraction system effectively addresses your requirements for particle size, dimensions, and quantity in the surface cleanliness assessment of product components. When paired with our proprietary cleanliness analysis equipment, it enables comprehensive cleanliness control and monitoring of parts.
Our company provides the following main functions of this equipment: High-pressure cleaning, perfusion cleaning, ultrasonic cleaning, and automatic spray cleaning The system integrates online filtration and membrane formation for cleaning agents with recirculating fine filtration and particle recovery, enabling simultaneous part cleaning and particulate contaminant filtration and recovery. It can promptly collect particulate contaminants from the part surfaces onto the filter membrane surface.
Our company’s cleanliness testing equipment, manufactured in accordance with the customer’s specifications, was installed and commissioned on-site at the customer’s facility on May 13, 2024, and operator training was subsequently conducted.
The following are photos from the acceptance inspection site for reference:




Case recommendation
undefined